|
Project
Information & Transportation
Studies of Interest |
|
Akron Central Interchange Project
Information on the proposed upgrades to the Interstates 76 & 77
Central Interchange and the near "West Leg" in Akron. A joint effort
between ODOT, the city of Akron and the Akron Metropolitan Area
Transportation Study. |
The Allen
Interstate 75 Study ODOT in cooperation with FHWA is proposing to
correct geometric deficiencies, improve pavement and bridge conditions,
improve safety, and increase transportation efficiency within the I-75
corridor in Allen and Auglaize counties, Ohio. |
Barreling
Ahead
is a program encompassing numerous
multi-million-dollar transportation-related projects in the Miami Valley
over the next decade. |
The
Brent Spence Bridge
and its approaches are key elements of the
nation’s Interstate Highway System. This facility,
carrying both I-75 and I-71 traffic through the Greater
Cincinnati/Northern Kentucky area, has significant
safety and capacity problems and is under study for
improvement.
For more details, click here. |
|
Cleveland Innerbelt Study/Cleveland Urban Core Projects.
The purpose of this study is to develop a strategy for the
intelligent renewal of the transportation infrastructure within the
Innerbelt Corridor in downtown Cleveland. The Public Involvement Process
is highly emphasized in this two-year effort,
click here to visit the Cleveland Innerbelt Study Website for more
information |
Far
East Freeway Study The Ohio Department of Transportation has
initiated a year-long study to find solutions that reduce congestion and
accidents on Interstate 70 between Interstate 270 and State Route 256.
Click here for more on this study. |
I-70/I-71
Columbus South Innerbelt Corridor Study
ODOT has begun efforts
on an 18-month study to seek solutions to the problems of congestion,
traffic delays and safety hazards on the I-70/I-71 split in downtown
Columbus, Ohio. Public input is an important part of this study,
click here for more details on the study and
how to participate.
|
I-75
Mill Creek Expressway
This study, in the Cincinnati/St. Bernard/ Elmwood Place area,
aims to improve traffic flow, enhance safety and minimize impacts to
adjacent properties along I-75 from the Paddock Road interchange on the
north and the Western Hills Viaduct interchange on the south. |
I-270
Columbus North Central Outerbelt Study
A 6-month study to seek solutions to the problems of congestion and
accidents at the interchanges of State Route 315, U.S. Route 23, and
Interstate 71, click here for more on this study. |
I-475
- Planning Toward The Future
ODOT has identified the need to initiate a study for
short, medium, and long-term improvements to the I-475
corridor in the Toledo Metropolitan area.
Click here for
more on this study. |
Maumee
River Crossing/The Veterans' Glass City Skyway
This distinctive downtown Toledo bridge is the
largest single project ODOT has ever constructed.
Click here for more about
this "new gateway for Toledo and the region." |
Northeast
Expressway Transformation (NExT)
on the I-270/State Route 161/Sunbury Road corridor is the
next big project for central Ohio.
Click here for more details on this 3½ year project. |
Toledo
I-75/I-475 Interchange, Improving your Ride This Study's Mission:
"To facilitate a process by which interested groups and individuals in the
Toledo Metropolitan Area will work with the project team to develop a
preferred alternative for improving the I-75/I-475 systems interchange that
can be approved and funded".
Click here for more. |
Thru
the Valley Project
The Thru the Valley project involves the widening and
reconstruction of I-75 from I-275 (on the north) to Paddock Road (on the
south) in Hamilton County, Southwest Ohio. |
U.S. 30 Informational Web Site
Information about upgrading U.S.
30 from a two-lane to a four-lane divided highway from Hancock County in
northwest Ohio to State Route 11 east of Lisbon in northeast Ohio. Visit:
www.us30.org |
U.S.
24 - "Fort to Port"
Realignment and expansion of U.S. Route 24 from
Ft. Wayne, IN to Port Toledo in northwest Ohio. This road is a major truck
route and creates safety problems because of its current winding
alignment. The new alignment will improve safety and increase
mobility. Construction is underway for one section of this project and two
other sections are under study. Click here
for more information. |
U.S. 224 Corridor Study
In
an effort to address congestion and safety concerns in the Canfield and
Boardman Townships area, ODOT and the Eastgate Regional Council of
Governments have undertaken a joint project to study the U.S. Route 224
corridor between SR 11 and I-680. Click
here for study details. |
|