| Anyone interested in bidding on any of the following projects please contact the LPA directly. This posting does not indicate that the project is currently being advertised, only that the sponsor has been authorized to advertise. The project will be advertised a minimum of 3 weeks. Please note that information remains on the web site for about one month from posted date. | To view pre-qualified subcontractors or DBEs please click on the link below: | |||
| DATE of AUTHORIZATION | CNTY-RTE-SECT | PID |
LPA Contact Name & Phone Number |
DESCRIPTION |
| 07/10/2008 | MAH-CR 18 - Mohoning Ave. | 83383 | Mahoning County Engineer Marilyn Kenner, P.E. (330)799-1581 |
The improvement shall consist of milling, pavement repair, curb ramps, minor bridge railing work, and resurfacing as set forth in the plans and estimate. The length of the project is approximately 27,113 feet (5.14 miles). |
| 07/01/2008 | HOL-CR145-0.48 Over Walnut Creek | 81378 | Holmes County Engineer Christopher Young (330)674-1856 cryoung@co.holmes.os |
Replacement of structurally deficient bridge over Walnut Creek including minor adjustment of the approach roadway. |
| 06/18/2008 | Wayne County, City of Wooster, Beall Avenue | 79091 | City of Wooster Joel Montgomery, PE City Engineer (330)263-5234 jmontgomery@woosteroh.com |
Reconstruction of 1.15 miles of urban arterial, including pavement widening asphalt resurfacing, brick pavers, sidewalk construction, landscaping, street lighting, waterline and sewer line replacement, and storm sewer installation. |
| 06/12/2008 | UNI-VARIES-2009GR | 81882 | Union County Engineer Tom Messerly (937)645-3118 tmesserly@co.union.oh.us |
Removal. replacement and instillation of approximately two miles of guardrail along various county roads. |
| 06/12/2008 | MER Prarie Creek Bridge | 83361 | Franklin Township
Trustees Brian May Fanning/Howie Inc. (419)586-2292 bmay@fhai.com |
Construct a pedestrian bridge over Prairie Creek on the south side of SR 219, adjacent to ODOT bridge no. 5403375 |
| 06/09/2008 | GRE - ACCESS ROAD | 75857 | Greene County
Engineer Gary T. Tobias (937)562-7500 gtobias@co.greene.oh.us |
Construction of a 3 lane, 5000 ft. long access road connecting state route 380 with Union Road (Phase 1 only) |
| 06/09/2008 | LUC-SR 184 - 1.86 | 81980 | City of Toledo Douglas Stephens, PE (419)936-2279 douglas.stephens@toledo.oh.gov |
Asphalt milling and resurfacing of approximately 3.5 miles of Alexis Road from Flanders to Jackman. The asphalt is to be milled to a depth of 2 inches and replaced with 1/2 inch asphalt leveling course and a 1 1/2 inch asphalt surface course. The project also includes concrete pavement repairs, pavement striping, structure adjustments, and concrete pedestrian ramps where required. |
| 06/05/2008 | Woo-Eckel Junction Road, Parts one and Two | 82769 | City of Perrysburg Douglas Dariano, Perrysburg City Engineer (419)872-7861 ddariano@ci.perrysburg.oh.us |
Intersection Improvements at Eckel Junction Road/Fort Meigs Road - Part one and Eckel Junction Road/State Route 199 - Part Two |
| 04/22/2008 | BEL-Bikepath Bridge Painting and Rehabilitation | 80905 | City of St.
Clairsville Dennis Bigler (740)695-0156 dops@stclairsville.com |
Rehabilitate an approximate 335 linear foot steel girder bridge with steel bent piers over SR 9. |
| 03/05/08 | FRA-SWACO ALT FUELS | 81384 | Joe Huston, Solid
Waste Authority of Central Ohio, 4239 London Groveport Road, Grove City, OH
43123 (614)871-5100 ext. 135 joe.huston@swaco.org |
Installation of CNG conversions on four (4) Chevrolet 2500 Series Pick-ups |
| 05/08/2008 | LOR SR 254 - 5.09 | 76037 | City of Avon Aaron Appell, Bramhall Engineering and Surveying Company (440)934-7878 aappell@bramhall-engineering.com |
Improvements on Detroit Road (SR 254) From SR 611 to SR 83 including pavement widening for a center turn lane, curb and gutter, signal replacement, drainage, and safety improvements. |
| 05/08/2008 | SEN-CR 6-9.90/VAR | 76270 | Seneca County
Engineer Mark R. Zimmerman, PE,PS (419)447-1011 zimmerman@bright.net |
Construct leveling and surface layers of asphalt on CR6, CR7, CR11, CR15, and CR51 to restore crown, install new berm and stripe the roads. |
| 04/24/2008 | SHE VANDEMARK ROAD | 81559 | City of Sidney Nick Miller, PE (937) 498-2335, ext. 8315 nmiller@sidneyoh.com |
An additional lane is to be added on Vandemark Road at the south approach. The additional lane will create a right-turn-only lane and a through-only lane. The existing traffic pole on the southeast corner will be relocated as will various utilities. |
| 04/22/08 | LOG CR VAR PM Ph. 1 | 83251 | Logan County
Commissioners/Engineer Scott Coleman, PE, PS (937) 592-2791 colemans@co.logan.oh.us |
Install Centerline Pavement markings in Logan County. |
| 04/22/08 | LOG CR 63 2.63 | 79660 | Logan County
Commissioners/Engineer Scott Coleman, PE, PS (937) 592-2791 colemans@co.logan.oh.us |
Replace the existing bridge on CR63 over Stoney Creek. This is a Design/Build project. |
| 04/22/08 | BEL-US40-19.66 | 80908 | City of St.
Clairsville William Street (740) 695-6481 streeteng@comcast.net |
Provide widening of US40 to provide for a double left center turn lane. The project will also consist of providing new curbing, sidewalk, guardrail. storm drainage, and waterline. The widening will consist of 10" ODOT item 305, and the complete project will be resurfaced with 1 1/4" ODOT item 448. |
| Along SR 309 (East Center Street) | City of Marion Terry Lively, PS, PE Assistant City Engineer (740) 387-2240 |
Construction of a pedestrian bridge over Grave Creek near Harding High School. Project involves construction of both abutments, scheduling the delivery of a pre-assembled truss bridge, and setting the bridge onto the abutments. Two abutment designs will be bid, the preferred design will be decided after bid opening. Bidders MUST be pre-qualified by ODOT for Level 1 Bridge Construction. Bids will be opened May 2, 2008 at 11:00 am local time. | ||
| 04/14/2008 | HAN-CR501-0.01 | 79588 | Hancock County Steve Wilson P.E., P.S. (419) 422-7433 scwilson@co.hancock.oh.us |
Replace deficient structure over Eagle Creek |
| 04/09/08 | DEF-TR68-0.75 | 75598 | Defiance County Warren Schlatter, P.E., P.S. (419) 782-4751 dce@defiance-county.com |
Replace existing structure over Web Run approximately 0.25 miles east of the CR153 intersection with a new structure. |
| 04/09/08 | LUC-COY RD. & PICKLE RD. INTERSECTION IMPROVEMENTS | 82248 | Deputy City Engineer Rodney Shultz, P.E. City of Oregon (419) 698-7015 rshultz@ci.oregon.oh.us |
Widening and resurfacing of 0.11 miles of Coy Road and 0.12 miles of Pickle Road to facilitate the instillation of of a new traffic signal and the addition of left turn lanes on all approaches, including sidewalk improvements, pedestrian ramps, traffic control items including pavement marking and signing, draining improvements and other appurtenances. |
| 04/03/08 | WAY - CR 0030A - EAST LINCOLN WAY | 81333 | Wayne County Engineer Roger K. Terrill, P.E., P.S. (330) 287-5500 groupmail@wayne-county-engineer.com |
The project involves resurfacing approximately 2.7 miles of C.R. 30A in Wayne County, micro surfacing approximately 1.1 miles of C.R. 30A, constructing a transition from a divided highway to a 2 lane roadway, cleaning existing storm sewers, repairing drainage in poor condition, providing guardrail, chip and seal shoulder surfaces, and updating pavement markings. |
| 04/03/08 | TRU - CR 193 (MAIN STREET) | 81003 | Service Director Mr. Don Wittman P.E. City of Cortland (330) 637-4637 servicedept@cityofcortland.org |
This 3R improvement project involves the roadway rehabilitation of 1.52 miles of Main Street within the City of Cortland. This project will consist of roadway widening and resurfacing 0.73 miles of Main Street, a two-lane urban connector, with treated shoulder / curbing and 0.79 miles of resurfacing with asphalt shoulder. Work items also include drainage, drives, grading and traffic control. |
| 04/03/08 | MUS-CR6/CR71/CR414 | 24277 | Muskingum County
Engineer Doug Davis P.E., P.S. (740) 454-0155 davis.mceo@rrohio.com |
Replacement of three bridges |
| 04/03/08 | POR-14-5.20 | 77557 | City of Streetsboro Mr. Bruce Terrell (330) 626-4942 bterrell@cityofstreetsboro.com |
This project consists of intersection improvements at the SR14 and Diagonal Road intersection including the addition of left turn lanes on all four approaches, a new traffic signal, shoulder widening, and resurfacing on SR 14 and Diagonal Road and new pavement markings, |
| 3/31/08 | STA - TREAMONT AVENUE BRIDGE | 80669 | Stark County Engineer David R. Torrence (330) 477-6781 drtorrence@co.stark.oh.us |
Rehabilitation of Treemont Avenue structure over SR 21, Tuscarawas River and existing separated crossing over Norfolk Southern and RJ Corman tracks, including structure lighting and associated approach roadway work, all within a project length of 0.190 miles |
| 3/26/08 | CLA - COUNTY GUARDRAIL PHASE 2 | 79012 | Clark County
Commissioners Bruce Smith (937) 521-1800 bsmith@clarkcountyohio.gov |
Guardrail removal and replacement including anchor assemblies. |
| 3/31/08 | STA - CLEVELAND AVENUE BRIDGE | 80090 | Stark County Engineer David R. Torrence (330) 477-6781 drtorrence@co.stark.oh.us |
Replacement of existing bridge No. CA-16-10, Cleveland Avenue over the west branch of the Nimishillen Creek in the city of Canton. |
| 3/26/08 | CHP - EAST LAWN AVENUE | 80375 | City of Urbana Mike Heintz (937) 652-4321 mheintz@ctcn.net |
Upgrade .78 miles of East Lawn Ave. beginning at Scioto Street, proceeding north to Mark Drive by widening and reconstructing the roadway, including curbing, sidewalk, drive aprons, storm sewer, sanitary sewer, water main, traffic control signs and pavement markings. |
| 3/26/08 | HOL - VARIOUS GUARDRAIL PHASE 1 | 82132 | Holmes County
Engineer Christopher YOung (330) 674-1856 cryoung@co.holmes.oh.us |
18,550 feet of Type 5 guardrail instillation. |
| 3/26/08 | MIA - GREAT MIAMI BIKEWAY CONNECTION | 77342 | Miami County Engineer Doug Christian PE, PS (937) 440-5656 dchristian@co.miami.oh.us |
Instillation of approximately 1.62 miles of 10' wide asphalt recreational trail. |
| 3/26/08 | POR - TALLMADGE ROAD (EDI-16 CH18L) | 79066 | Portage County
Engineer Scott Miller (330) 296-6411 smiller@portageco.com |
Imrovement of 0.09 miles of Tallmadge Road (CH 18) by replacement of existing two span reinforced concrete slab structure over Silver Creek, including approach construction and replacement of a deficient culvert east of the bridge. |
| 3/19/08 | RIC - TR 371-0.05 Moffet Rd | 77241 | Richland County Robert Cunning (419) 774-7505 smyers@rcengineer.com |
Bridge replacement with single span non-composite prestressed box beam structure. |
| 3/19/08 | RIC-TR177-0.20, Terman Rd | 79037 | Richland County Robert Cunning (419) 774-7505 smyers@rcengineer.com |
Bridge replacement with single span non-composite prestressed box beam structure. |
| 3/10/08 | LOR-US 0020-16.93 | 21936 | City of Elyria Mukund R. Moghe, P.E. City of Elyria Engineer (440) 326-1444 mmoghe@cityofelyria.org |
Improvement of 5.25 miles of US20/SR57 and side
street approaches in the City of Elyria, Lorain County, Ohio. Project
reconstruction includes intersection improvements with signal upgrades and
extension of turn lanes and associated roadway improvement. |
| 3/12/08 | MOT -HOKE RD | 83568 | City of Clayton |
Upgrade regulatory and warning signage within the corridor, improve operations at the intersection of Hoke road and SR49, install post mounted flashers to better delineate the school zone in front of the Miami Valley Career Technology Center south of SR49 |
| 3/12/08 | WAY-LARWILL STREET | 81635 | City of
Wooster Joel Montgomery, PE City Engineer (330) 263-5234 jmontgomery@woosteroh.com |
Replacement of an existing slab bridge with a 34 foot, single span reinforced concrete slab bridge on reinforced concrete abutments and drilled shaft foundations. Project also includes 1794 feet of sidewalk. 259 feet of 16" water line, and 111 feet of storm sewer, together with all appurtances. |
| 3/12/08 | HUR CR PM FY2009 | 82143 | Huron County
Engineer's Office Joseph B. Kovach, P.E., P.S. (419) 668-1997 jbkovachhce@accnorwalk.com |
Painting of centerline and edge lines on various Huron County roads. |
| 3/5/08 | HAN-CR99-1.53 | 75049 | Hancock County Steven Wilson, P.E., P.S. (419) 422-7433 scwilson@co.hancock.oh.us |
Resurface existing pavement on CR99 and CR212. |
|
3/5/08
|
MOT-Main Street Phase 3 | 79709 | City of Englewood Eric Smith (937) 836-5106 x218 smith@englewood.oh.us |
Scenic and environmental enhancements,
decorative lighting, traffic signals, landscaping, and other beautification
improvements. |
| 3/5/08 | SUM-CR 05-8.04 | 24504 | Summit County
Engineer Robert L. Bunnell, P.E. (330) 643-8458 RBunnell@engineer.co.summit.oh.us |
South Main Street Phase IV - This project involves the improvement of South Main Street form Althea Avenue to Swartz Road. The proposed work consists of the following: providing an exclusive right turn lane for traffic traveling southbound on South Main Street and turning at North Turkeyfoot Road; widening the roadway to the east to provide two through lanes for southbound traffic in addition to the exclusive right turn lane to N. Turkeyfoot Road, and to provide two lanes for northbound traffic (one through lane and one lane that combines the through movement with the left turn from South Main Street to North Turkeyfood Rd); demolition and reconstruction of the bridge over the Tuscarawas River; modification of traffic signals; drainage; and application of new pavement markings. The project includes the improvement of approximately 600 feet of North Turkeyfood Road for the construction of an additional turn late at the approach to the South Main Street intersection. The project also includes the improvement of approx. 700 feet of Swartz Rd for the construction of an additional turn lane at the approach to S. Main St. intersection. |
| 3/4/08 | MOT McEwen Road | 81534 | Washington Township Mike Wanamaker (937) 438-7988 Mikew@washingtontwp.org |
Construct a traffic signal at the intersection
of McEwen Road and Congress Park Drive in Washington Township, Montgomery
County. Includes installation of new poles, controller, vehicular and
pedestrian signal head with LED lamps, revise pavement markings, and upgrade
pedestrian crossing and curb ramps. |
| 3/4/08 | HAN-CR304-0.00 | 75795 | Hancock County Steven Wilson, P.E., P.S. (419) 422-7433 scwilson@cohancock.oh.us |
Resurface the existing roadway with asphalt concrete. |
| 3/4/08 | MOT Stewart Street | 80024 | City of Dayton Steve Finke, P.E. (937) 333-3839 Steve.Finke@ci.dayton.oh.us |
Replacement of the structure on Stewart Street over the Great Miami River including approach reconstruction and pavement replacement. |
| 3/4/08 | POR-Kent Hike and Bike Trail | 80660 | City of Kent Robert Climes (330) 678-8106 climes@kent-ohio.org |
Construction of 7,500 lineal feet of trail from Middlebury Road to Fred Fuller Park. Trail consists of 6574 L.F. of 10' wide asphalt trail, 176' long pre-fabricated bridge with abutments across the Cuyahoga River and 750 L.F. of Boardwalk. Also, includes earthwork, culverts and fencing. |
| 3/4/08 | LUC-Lathrop House | 80381 | Metropolitan Park
District of the Toledo Area 5100 West Central Avenue Toledo, OH 43615 Mr. Jim Speck (419) 270-7513 james.speck@metroparkstoledo.com |
Phase I Stabilization of the Lathrop House, including structural reinforcement of the first floor, new wood shingle roof, new gutters/downspouts, new and restored wooden windows, reconstruction of missing/damaged porches/entries, and restoration of the wood siding. |
| 3/4/08 | SEN-VAR-PM FY 2008 | 82487 | Seneca County
Engineer Mark R. Zimmerman, P.E./P.S. (419) 447-1011 Zimmerman@bright.net |
Installation of long line and auxiliary polyester pavement markings along various County Roads. |
| 3/4/08 | MAH-Slippery Rock Bridge (Mill Creek Park) | 78404 | Mill Creek Park
District Mark Fisher, P.E. (330) 702-3000 millcreek@zoominternet.net |
Repair of Slippery Rock Bridge in Mill Creek
Park by removing and replacing the asphalt wearing surface and deck
waterproofing, cleaning and repairing stone masonry surfaces, repair and/or
replacement of bridge and approach walkways and curbs, replacement of catch
basins, regrading embankment slopes and placing gabion basket erosion
controls, cleaning and painting of bridge railing and lintel beam masonry
supports, and other incidental items required to complete the project.
|
| 3/4/08 | CLA-SR 4-16.27 | 25123 | City of Springfield Leo Shanayda, City Engineer (937) 324-7310 lshanayda@ci.springfield.oh.us |
This project consists of resurfacing and reconstructing SR4 from Belmont Avenue to Home Rd. Also includes installation of new curb, driveways, and storm sewer. |
| 3/4/08 | TUS-NCT 121-510 | 75991 | Tuscarawas County
Engineer's Office Wayne Crilow (330) 339-6648 tuscoeng@wilkshire.net |
Removal of existing two-span concrete slab deck, abutments and pier. New single span composite pre-cast, pre-stressed reinforced concrete box beams with composite concrete deck on capped pile stub-type abutments, each with a single row of cast in place concrete piling. Span = 62'-0" c/c Abut. Bearings. |
| 3/4/08 | TUS- Sugarcreek | 80564 | Village of Sugarcreek | Enhancement project to define entrance into Sugarcreek Business Area. Work to include pavement, curbs and ramps, sidewalks and crosswalks, street lighting, signal poles, utility line replacement, and landscaping. |
| 3/4/08 | CUY - Snow Road | 80933 | Cuyahoga County | Repair and resurface Snow Road from Ridge Road to Broadview Road in the City of Parma. |
| 2/14/08 | CUY - Rockside Rd | 78716 | Cuyahoga County |
Replace the existing single-span steel girder
bridge on stub abutments over the Ohio Canal and Cleveland Metro Parks
Towpath Trail due to structural deterioration and abutment foundation
failure. ---- 2008 CEAO LBR Program |
| 2/14/08 | TRU-East Market Street | 79823 | City of Warren William Totten (330) 841-2562 btotten@warren.org |
Maintenance project consisting of approximately 3.3 miles of resurfacing along East Market Street, SR 82, and Warren Sharon Road including new curb, sidewalk, ADA curb ramps, concrete drive approaches, decorative concrete crosswalks, concrete bus pad repair, removal of two concrete bus pads and new pavement markings. |
| 2/15/08 | POR-Middlebury Road (KEN-193) | 78013 | Portage County
Engineer Mr. Scott Miller, P.E., Assistant County Engineer (330) 296-6411 smiller@portageco.com |
Improvement of 0.11 mile of Middlebury Road in the City of Kent by replacement of an existing single span of steel truss structure over the Cuyahoga River including approach construction. |
| 2/15/08 | GRE-Orchard Lane / Factory Rd | 77692 | Greene County
Engineer Gary Tobias (937) 562-7500 engineering@co.greene.oh.us |
Construct new road from Orchard Lane to Factory Road. |
| 2/15/08 | SAN-NCIT Elmore to Fremont | 80565 | Sandusky County Park District | Construct a 10-foot wide asphalt bike/hike trail with proper signage and safety railing along the abandoned Penn-Central railroad line right-of-way. This project is about 10.5 mile long starting in downtown Elmore and proceeding in a southeasterly direction to the City of Fremont. Perform necessary related work. |
| 2/14/08 | FUL - VAR PM Phase 1 | 81977 | Mrs. Brinda S. Miller Fulton County Board of Commissions (419) 335-3816 bmiller@fultoncountyoh.com |
Installation of Polyester pavement markings on various Fulton County Roads. |
Last Updated: Friday, July 11, 2008